PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Exterior metal framing Facing North.jpg Curtain Wall Mullions 1.jpg Installed door frames at Stair -4 Facing East.jpg Installed sprinkler branches-heads at the 3rd floor Facing North.jpg Installing Monumental Stairs Facing South.jpg 1st floor VAV boxes Facing West.jpg
Previous pageNext page Curtain Wall Mullions 1
Curtain Wall Mullions 1